| MAVERICK TUBE CORP. MANUFACTURING FACILITY LOUISVILLE, KY 485,000 sq. ft. Approximate Cost: $14.27 million Project duration – 9 months This was a design build project. Ray Nabholz, owner and president of NBMC, worked personally with Maverick Tube and their engineers to design and construct this massive manufacturing plant. The work done by the company involved pouring concrete slabs, footings, and equipment pads as well as erecting the metal building (see top left). NBMC was also responsible for managing the many subcontractors involved in the completion of the structure |
||||||||||||||||||||
![]() |
||||||||||||||||||||
![]() |
||||||||||||||||||||
| ESTES STADIUM UNIVERSITY OF CENTRAL ARKANSAS CONWAY, AR 43,000 sq. ft. Approximate cost $ 5.2 million Project Duration - 9 months This project was a new construction of a stadium and field house for the University of Central Arkansas. Also included were coaches offices, weight rooms, locker rooms, and concessions. The home side facility seats approximately 5,000 fans. NBMC was awarded the ABC Excellency in Construction Award. |
||||||||||||||||||||
![]() |
||||||||||||||||||||
![]() |
||||||||||||||||||||
| ST. LOUIS CATHOLIC CHURCH SANCTUARY ADDITION CAMDEN, AR 2,845 sq. ft. Approximate cost $ 320,000 Project Duration - 6 months This sanctuary addition and renovation involved demolition of the existing structure and the addition of concrete block with brick veneer. Wood trusses were used with composition shingle roofing. Additional work included interior remodeling and finishes as well as site drainage work. |
||||||||||||||||||||
![]() |
||||||||||||||||||||
![]() |
||||||||||||||||||||
| GSA, PUBLIC BUILDING SERVICE JUDGE ISSAC C PARKER FEDERAL BUILDING FORT SMITH, AR 25,000 sq. ft. Approximate cost - Confidential Project Duration - 4 months This federal building remodel required interior finishes on three floors. Work involved metal studs, drywall, oak paneling and trim, as well as carpet and tarazzo flooring. Beautiful oak paneling and trim was placed in the federal courtroom (see bottom right). NBMC was awarded the GSA Outstanding Performance Award on this project. |
||||||||||||||||||||
![]() |
||||||||||||||||||||
| Next Page |
||||||||||||||||||||
| Project |