FAMILY LIFE BIBLE CHURCH
NEW FACILITY
CONWAY, ARKANSAS
21,678 sq. ft.
Approximate cost: $1,649,945
Project Duration – 8 months
For this project, NBMC constructed a new
worship center capable of seating 350
people. The building houses the sanctuary
with baptistery, the fellowship hall, and a
full commercial kitchen. The building also
has 8 administrative offices, 10 classrooms
and 6 restrooms. The exterior of the
building is rock and brick with a covered
drive thru.
Additional work included a state of the art
sound system and projection screens.


CONWAY CHRISTIAN SCHOOL
NEW JUNIOR & HIGH SCHOOL
BUILDING
CONWAY, ARKANSAS
40,819 sq. ft.
Approximate cost: $2,124,311
Phase I Duration – 6 months
NBMC, Inc. acted as construction manager for
phased construction of the new campus for
Conway Christian School. Phase I included the
site preparation, parking areas and the Jr./Sr.
High School building that was a pre-engineered
steel building with brick exterior topped with a
pre-fabricated cupola, base, dome and cross.
This building houses the administrative offices,
teacher lounge, media center, computer and
chemistry labs, classrooms and cafeteria.
CONWAY CHRISTIAN SCHOOL
NEW GYMNASIUM BUILDING
CONWAY, ARKANSAS
Phase II Duration – 8 months
Phase II was the addition of a gymnasium and
commons area including concession stand,
dressing rooms, bathrooms, and offices to the
existing school structure. Lower left picture is of
NBMC's president Ray Nabholz accepting an
award bestowed by the school during its
dedication ceremony.

SONSHINE ACADEMY
NEW FACILITY
CONWAY, ARKANSAS
15,625 sq. ft.
Approximate Cost: $662,000
Project Duration - 7 months
New 125’ x 125’ x 24’ metal building
facility on concrete foundation. The
work included metal building erection,
curbs and gutters, storm drainage, and
asphalt paving. Facility includes
gymnastics area, dance rooms,
bathrooms, offices, and Pro Shop.
SONSHINE ACADEMY
BUILDING ADDITION
CONWAY, AR
12,000 sq. ft.
Approximate Cost: $415,000
Project Duration – 5 months
Metal building addition to work
previously completed. Work included
expanding the existing metal building to
accommodate the growing number of
students.
Project Photos Cont'd